evaluation of work confidentiality provisions of the "evaluation of work
rules (2006 edition)" the provisions and subject to the following provisions:
(a) cell phone jammer blocker is not recommended for the large vehicle.the bid
evaluation committee members, evaluation team members working on the project all
the evaluation data must be kept confidential, not with the bidders for the
evaluation of the talk without outside interference and influence. (b) the site
of the officer shall arrangements related work, turn off mobile phones, pagers
and other communication tool, the evaluation of the entire process must be
confidential and shall not leak. (c) evaluation during the evaluation of the
information may not be out of the workplace, the end of the evaluation After the
unification of all data collated by the evaluation working group submitted the
tender units (four) units and tender agent, the tender will be informed of the
results of the tender evaluation unit, but not the obligation to explain the
successful bidder and / or the reasons for not winning. tender units: This kind
of GPScell phone jammer fits the large vehicle such as the truck.Tender:
Shanghai Shentong Group Co., Ltd. Shanghai Metro Line Limited ten tender agent:
Tender Agent: Shanghai International Tendering Limited three times a year March
1, 13, 27 Shanghai Metro Line of the Expo Site-specific traffic tie-line
equipment supply and engineering services PSD Tender No.: 10248306 Annex 2 to
submit the bid bond and returned to operating instructions (January 1, 2010 come
into operation) was built according to Shanghai Construction and Management
(2005) No. 65, "Construction on construction projects in Shanghai centralized
bid bond submitted notice" of the requirements for bidders to make a timely
submission of the refund of the bid bond and is formulated information.page one
bank account to submit the bid bond name and account number (hereinafter
referred to as bid bond account) Account Name: Shanghai Building Materials
Industry Service Center Account received: Thecell phone jammer blocker I should
be plugged into the car’s lighter socket after starting the engine. Bank: China
Construction Bank, Shanghai Second Branch Second, the submission and return the
location and time of tender submission and deposit refund Location: Shanghai
Xuhui District No. 780 wooden bridge a small wooden bridge China Construction
Bank Shanghai Branch (hereinafter referred to as custodian banks) to submit and
return Time: 9:00-11:30 am, the legal working day, afternoon 13:00-16:30 Third,
the submission and return tender by way of security (a) presented in a way to
check, cashier's checks, bank drafts, credit vouchers, wire transfer, online
payment, bank guarantees. The isolating signal bandwidth ofcell phone jammer is
GPS 1500MHz-1600MHz.1, the payer must have a bid bond construction enterprise
qualification of independent legal entities, and consistent with the bidders
name, shall be submitted on behalf of commissioned branches 2, bidder must
follow the requirements of the tender documents in full and submit the bid bond
amount, the excess shall be submitted, but may not provide false and invalid
ticket functions. The isolating signal bandwidth ofcell phone jammer, The bidder
shall not be used in cash and transfer through the endorsement of checks,
cashier's checks, bank drafts submitted bid bond 4, the applicant must be a bank
guarantee bidder 5, bank guarantee adoption of the model style (demonstration
style can be obtained from the custodian bank) (b) refund the approach to the
custodian bank to return the original export certificate of special transfer
bank accounts.
No comments:
Post a Comment